The Pre-Start CDM Checklist: 20 Things to Confirm Before Breaking Ground

Atker Consultancy Team · March 2026 · 5 min read

The pre-start phase is where CDM compliance is either set up properly or set up to fail. By the time the first contractor mobilises on site, all of the foundational obligations should already be in place. In practice, they frequently aren't — and the consequences play out throughout the construction phase.

F10 & Appointments

SHE Plan & Programme

Meetings & Readiness

Why this matters

A project that starts with all of these items confirmed is a project with a strong CDM foundation. More importantly, it's a project where all duty holders understand their responsibilities from day one.

The pre-start checklist isn't bureaucracy. It's the thing that prevents the 3am phone call six weeks into construction when an HSE inspector finds that the Construction Phase Plan was never formally accepted, or that two subcontractors were inducted without their competency records being checked. Document everything, keep records, and do the check properly before the project starts.

The Atker CDM Digital Audit Tool covers all pre-start obligations and construction phase checks in a single offline-ready checklist. Photo evidence, action log, PDF export included.

Get the tool — £14.99
← Back to all insights
Atker Consultancy Team · March 2026
More from the blog

Keep reading

CDM 2015

CDM 2015 Explained

6 min read →

Pre-start

Pre-Start CDM Checklist

5 min read →

Compliance

F10 Notification Guide

4 min read →